料號參照
常見問題
 
ISO9001
       
  How to calculate efficiency of LDO?  
  Ans:

The power efficiency is the ratio of output power and input power. The output power equal to product of VOUT and ILOAD and input power is a product of VIN and IIN. For LDO application, the input current IIN is summing by ILOAD and IGND. If ILOAD is great than IGND, then we can neglect IGND.



 
  What is the relation between PSRR, VIN ripple and VOUT ripple?  
  Ans:

The PSRR can be found from data sheet. If PSRR is 60dB@1KHz that indicates the VOUT ripple is one of one thousandth of VIN ripple.
20log X = 60 dB
log X = 3
X=1000
So the ripples will be reduced by 1000 times.

 
  Does CMOS LDO need minimum IOUT?  
  Ans: No, CMOS LDO does not need minimum IOUT because the required current to shut down internal transistor is very small.  
  How to calculate junction temperature of LDO?  
  Ans:


TJ = (θJC * P ) + TC

Thermal of case.
Power loss.
Thermal resistance Junction - case.

 
  What is the maximum voltage a boost IC may reached? (not consider the situation of Duty cycled)  
  Ans: 1.If boost IC has OVP function, then maximum voltage can't exceed voltage of OVP function at the time of the design.

2. If boost IC has no OVP function, the maximum output voltage can’t exceed maximum SW pin voltage subtract rectifier forward voltage. The maximum SW pin voltage is listed on the Absolute Maximum Ratings in datasheet.

 
  How to calculate (a) Buck circuit duty cycle;(b) Buck circuit inductor;(C)Buck circuit COUT  
  Ans:

a) Buck circuit Duty cycle:

b) Buck circuit inductor :
Choose an inductor to maintain continuous-mode operation down to 10 percent of the rated output load:

ΔIL = 2 x 10% x IO

The inductor value “L“ is :(when D is from a)


c) Buck circuit COUT


Choose Cout ,we need to check ESR:


Example:
If:VIN = 12V ;VO = 3.3V;IO = 0.1A~3A;VD = 0.5V;RDS(ON) = 30mΩ;fs = 300K Hz



So Duty cycle is 30.6%

ΔIL = 2 x 10% x IO = 2 x 0.1 x 3A = 0.6A



so choose L >14.8μH.

(ripple is smaller or equal to 50mV)

Choose Cout ,we need to check ESR:


 
  How to calculate inductor of boost circuit?  
  Ans:

If: VIN(min)=3V;VOUT=12V;IOUT=300mA;fs=300K Hz

so choose L >10μH

 
  What Lead-Free / RoHS compliance solution?  
  Ans: The termination plan of leaded products began in 2004. It was to remove Pb from terminal finish and converted to matte tin as standard terminal finish.
 
  Are all Lead-Free products RoHS Compliance?  
  Ans:

Lead-Free Products offered by AME are RoHS-Compliance. RoHS-Compliance means that the part is free of Lead (Pb), Cadmium (Cd), Hexavalent Chromium (Cr+6), Mercury (Hg), PBB's and PBDEs. Since none of our processes or parts use or contain Cadmium, Chromium, Mercury, PBB's and PBDEs, Lead is the only restriction of the use of hazardous substance that applies to our parts. If AME designates a part is Lead-Free, It is also RoHS-compliance.

 
  What is recommended soldering temperature profile for Lead-Free products?  
  Ans:

Our goal is to meet the industry standard for reflow that is mostly defined in
J-STD-020C, which requires a maximum peak of 260°C depending on the component volume. AME suggest reflow profiles should Conform to J-STD-020C

  IR*2
Average Ramp-up Rate (Include 217oC to Peak) Max 3°C/Second
Preheat Temperature 175(25) °C 60 to 180 Seconds
Temperature Maintained Above 217°C 60 to 150 Seconds
Time Within 5°C of Actual Peak Temperature 20 to 40 Seconds
Peak Temperature (Minimum) 260 +0/-5°C
Ramp-Down Rate 6°C /Second Max.
Time 25°C to Peak Temperature 8 Minutes Max.

 

 
  Dose Lead-Free backwards compatible?.  
  Ans:

Lead-Free lead frame-based packages are backward compatible. This means that lead frame-based Components with Matte Tin finish can be attached to a PCB using Tin/Lead solder paste with a Tin/Lead solder profile.

 
  Is there Tin Whisker Growth Evaluation?  
  Ans:

All test methods of Tin Whisker are performed according to the Whisker growth condition recommended by National Environmental Methods Index. Before the reliability test, All samples must pass optical microscope visual inspection for initial quality verification to meet AME's specification. After the reliability test, All samples must pass SEM (Scanning Electron Microscope) inspection for Whisker change verification to meet <50 um specification.

 
  Is AME Lead-Free Products implement post Matte Tin plating bake?  
  Ans:

100% Matte Tin Plated products undergoes a post Tin plating bake for 1 hour at 150°C within 24 hours of plating. This post plating bake is also referred to as "Annealing" to Inhibit the Whisker growing.

 

Copyright © 2006 AME, Inc.  All Rights Reserved. info@ame.com.tw